• Tunnel Shield Project 500gpm Mud System to Thailand
  • Solids Control Equipment Exported to Indonesia
 Tunnel Shield Project 500gpm Mud System to Thailand

Tunnel Shield Project 500gpm Mud System to Thailand

Shield Method is one fully mechanized underground construction Method. The shield ...
Solids Control Equipment Exported to Indonesia

Solids Control Equipment Exported to Indonesia

Indonesia once is the unique OPEC nations from Asia. The prove...
Previous
Next

Any intelligent author can make things bigger and more complex. It takes a touch of genius - and a lot of courage to move in the opposite direction. Everything should be as simple as it is, but not simpler.

6 Reasons why choose us

Robust Framework

Our themes are built on Warp, a powerful framework which provides a rich tool set for development

Responsive Design

Our themes are built on a responsive framework, which gives them a friendly adaptive and scalable layout

Quickstart Included

Each theme comes packed with a quickstart installation setup to replicate our interactive live demo

Advanced Features

We've enhanced the Warp theme to include some nice features that makes customization a breeze and enjoyable

Cross Browser Compatible

Each theme is built on HTML5 and CSS3; We've tweaked each template to support all modern browsers

World Class Support

We put a humongous amount of effort in providing top-notch Joomla support for all current and future templates

Latest News

GN Solids Control Syatem

GN SOLIDS CONTROL EQUIOMENT AND SYSTEM

    As a first API certified manufacturer of solids control system in China, GN solids control is specialized in design and build solids controls system for oil and gas drilling
rigs and mud recycling system for HDD&CBM drilling rigs.
 
     For environmental reasons and to reduce cost, solids control system is now prevailing in various drilling spot. Generally, a complete GN solids control system basicly
consist of  four stage equipment:shale shaker, desander, desilter, and centrifuge.
 
                                                 for oil and gas drilling

Premary Stage Solids Control: GN's linear motion shale shaker

    GN's shale shaker enjoys a high G force which can be adjusted. And, GN's shale shaker adopts a patent rubber sealing method for shaker deck and screen. And also,
GN's shale shaker deck could be adjusted from -1°to +5°while operating. Generally, GN 's shale shaker can separate solids larger than 100 microns.

Second and Third Stage Solids Control:GN's desander and desilter

     GN's desander and desilter uses PU material cones for longer service life. After processed by desnader and desilter, the solids in drilling mud will be smaller than 20 microns.
Alternatively, a mud cleaner with the combination of desander and desilter is available.(add a picture)

Final Stage Solids Control: GN's decanter centrifuge

     GN's decanter centrifuge is to remove solids in 2-5 microns out. GN’s decanter centrifuge enjoys a longer service life for the bowl cylindrical and conical section is made of duplex
stainless SS2205, and the screw and solid discharge port is protected by tungsten carbide tiles.
 
     Instead of collecting equipemnt from different suppliers, GN has the ability to manufacture all the equipment required for a set of solids control system in an factory over 65,000 ㎡.
All the components for a whole system are designed to functions singly, in addition, GN is qualified to make the most suitable design according customer's requirements.
 
           solids control equipment

GNPS70-3S Shale Shaker

Shale shaker GNPS70-3S is high efficiency shaker. It is designed according to users’ actual demand based on modern technique and principle. GNPS70-3S takes advantage of double vibration motors in-phase principle. It holding ideal design on structure, and work steadily, operated lasting time without any problem, take rather little cost on maintenance. If choose proper model or parameters, it can work for many kinds of drilling fluid solids control. It is an ideal solution for Oil and gas drilling, HDD, Metallurgy, mining tail mud solids control.

 

Structure of GNPS70-3S Shale shaker

GNPS70-3S shaker contains pedestal, shaker deck, tension wedge, shaker screen, rubber strip, deck adjustment device, baffle box, tension device, electric cabinet, vibration motor, damping spring. It can be used by single or designed as tandem and triplex shaker to be operated at drilling job site.

Features of GNPS70-3S Shale shaker

  » GNPS70-3S Shale shaker is designed as double motors in-phase principle. The shale shaker will vibrate as elliptical, part of spare parts are interchangeable with international shale shaker.

Our Partners