Dec 27

Today , I will show you one 250 GPM solids control system both workable for diamond driling and rotary mud drilling . This system is 3 phase cleaning mud system with shaker , desilter , centrifuge . It’s cut point reaches from 5 microns to 7 microns .

For the transport of total solids control  system , it’s dimention with attachements reaches to 7500mmX2450mmX3000mm, weight will be within 12 Tons . You needn’t disassemble equipments while travalling . The total storage capacity 2600Gallons and clean mud capacity reaches to 1300 gallons in the total solids control system .

This solids control system including 3 compartment (shaker compartmente , desilter compartment , centrifuge compartment). Mixing hopper on the top of tank with pump under tank . This unit will be much more compact and convenient for international and local delivery . GN Solids Control always design and manufacture as per buyyer’s request for solids control system . Please visit us for more information .

Share

Related posts:

  1. Diamond Drilling Mud Cleaning Equipments
  2. Solids Control decanter centrifuge

written by GN Decanter Centrifuge \\ tags: , ,

One Ping to “Solids Control System for diamond and rotary drilling”

  1. Solids Control System for ZJ30 oil drilling Rig Says:

    […] 2) 2 sets of aggravated pump can suck mud from 3# tank. The aggravated mud can be discharged to 2#, 3# tank in the totally solids control system. […]


Leave a Reply